The specific scope of work included design and production of CAD documents indicating the layout and design of the plumbing systems, HVAC systems, and structural design, specifications, and required load calculations for the Bechtel Ivanpah Administration / Maintenance / Warehouse building at Ivanpah Dry Lake, California. This included all plumbing designs of the sanitary waste and vent, domestic hot and cold water, make-up water and drain for humidifiers, eyewash and compressed air system. The HVAC design was for complete systems for all uses, including offices, administration and employee welfare, equipment rooms, maintenance areas, and primary facility control rooms. Structural engineering included foundations and mezzanines and integration of the pre-engineering metal building systems.