UC Davis

Relocation of Clinical Engineering Department

As part of a chemistry lab remodel project, ATI assisted UC Davis with the conversion of two Chemistry Labs. The two labs are 960 sf each and are located in the basement of the Chemistry building. The rooms were outfitted with casework and finishes appropriate for chemistry laboratories. Doorways to both rooms were widened to comply with accessibility regulations. Adequate space was provided for various laboratory equipment, including new hoods, refrigerator, glassware drying racks, and incubator.

The project also included laboratory-appropriate building upgrades to the HVAC, Plumbing, and Electrical Power Systems which were all performed by ATI.

Contact Us

Please send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
John Wayne AirportUSPS, Napa Seismic Evaluation