Lineage Logistics

Agua Mansa Distribution Center

Colton, California

ATI provided master planning, entitlements, bid package, and oversaw the bidding and selection of a Design-build General Contractor for Lineage on their new Colton, CA, distribution facility. The overall facility is 420,000 sf, and includes a cross-dock area, a partitioned convertible and freezer area, banana ripening rooms, and minimal dry storage. Temperatures vary from -20 degrees to ambient.

Construction is of concrete tilt-up walls at primary employee and visitor entrances. The balance of the facility features exterior insulated metal panel walls over a steel frame. All areas of potentially different temperatures are structurally separate for maximum thermal and vapor separation.

Contact Us

Please send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt
Sysco Food ServicesSysco Houston